FLOATING SEA BARRIER WORKS AT SENTOSA BEACHFRONT AND SENTOSA COVE
FLOATING SEA BARRIER WORKS AT SENTOSA BEACHFRONT AND SENTOSA COVE
This is a revision of Port Marine Notice No. 019 of 2021. The working period has been extended.
Applicable to: Mariners operating off Sentosa Beachfront and Sentosa Cove
With effect from 01 Oct 2021 to 31 Mar 2022.
Realignment and joining of floating sea barriers will be carried out using crane barge and work barge. A tug will be deployed to assist the positioning of the crane barge and work barge.
A safety boat will be deployed to warn and direct craft in the vicinity to keep clear of working area.
When in the vicinity of the working area, mariners are reminded to:
a) Keep well clear of the working area;
b) Maintain a proper lookout;
c) Proceed at a safe speed and to navigate with caution;
d) Maintain a listening watch on VHF Channel 68 (West Control);
e) Communicate with West Control for assistance, if required.
- Maritime and Port Authority of Singapore
- Port of Singapore
- Circulars and Notices
-
FLOATING SEA BARRIER WORKS AT SENTOSA BEACHFRONT AND SENTOSA COVE
Don’t miss the latest news from the Singapore Marine Guide, sign up for our newsletter to find out more
Post a Comment
You must be logged in to post a comment.